Tekapo Power Scheme Open Day

Tekapo Power Scheme Open Day

Various images taken during Genesis Energy’s open day for the Tekapo hydro power scheme. Construction of Tekapo A commenced in 1938 but was not completed until 1951. It currently generates 131GWh annually

Posted by ambodavenz on 2023-03-16 05:07:15

Tagged: , Spillway , Tekapo A , Tekapo , Genesis Energy , Hydro Scheme , Mackenzie District , South Canterbury , South Island , New Zealand , Power Station , Energy , Electricity , Power Generation , Renewable Energy