River Dargle Flood Defence Scheme.
These images were taken during the last full week of September, 2016.
Constant traffic nowadays with hard material being trucked in and dumped in storage areas along The Slang/Rehills section of the river bank.
By now we shouldn’t be surprised by anything, having seen so many changes and reversals to work previously carried out and completed during the past 4.5 years.
But we were baffled when they started to dump fresh loads of filtered soil in an area of the bank previously finished and properly landscaped.
On the top of the bank, directly opposite the La Vallee complex, the contractors proceeded to open up, and strip away, a renewed access ramp leading back towards the Riversdale complex.
‘Here We Go Again’!
Obviously this would require further investigation.
Sure enough, when we checked out the stretch opposite the Riversdale apartment complex, we saw them working on a section of the opposite bank.
Some 4 years ago this steep part of the bank had been stripped away and a lot of work invested in ‘soil stitching’, intended to stabilise the integrity of such a steep, but ‘exposed’ bank. The soil on the hill behind had been prone to slippage, aggravated by shallow rooting trees etc.
It would seem that yet another strip will have to be similarly treated to ‘preserve’ it’s integrity.
Yea, it begs the question:
Why wasn’t this fully scoped when the first work was being implemented, and/or was it a factor is causing (what I call) erosion-spread?
Check out the images here, taken in August 2012:
Posted by O Suave Gigante on 2016-09-30 16:46:47
Tagged: , Komatsu D65PX , CASE CX210 Hydraulic Excavator , Volvo A30E , Volvo A30D , Articulated Dump Truck , Kobelco SK250 , Hydraulic Excavator , Hitachi Hydraulic Excavator , Hitachi – Zaxis 350LC , KOBELCO SK250 LC Dynamic Acera , Mini crawler excavator , New Holland E135SR Hydraulic Excavator , Vincent Dempsey Plant , NEW HOLLAND , Bray , Wicklow , Dargle River , River Dargle , Flood Protection Scheme , The Slang , Fassaroe , River bank engineering , Landscape engineering , River Dargle Flood Defence Scheme , La Vallee , Bray Flood Defence Scheme , A25D Volvo Articulated Hauler 6×6 , Rehill , Dolmen Stones , Dargle Dolmen Stone Set , River Dargle Dolmen Stones , Engineered riverbed , Wills Bros Civil Engineering Contractors , Wills Bros Ltd. , La Vallee landscaping , Bed widening and adaptation works , Alleviating flood risk , In river works , Debris traps , Lowering of the river bed , Lakeside Plant Hire , Ruscon 2000 Slurry Tanker , Volvo EC 480 EL Crawler Excavator , Caterpillar CB-224C , CAT CB-224C smooth drum compact roller , JONS Civil Engineering Co. Ltd. , Sheet pile driving , Sheet pile driving Hydraulic Hammer , Hilliard & Hilltwister Ltd , Heron , Vibratory Hammer , ICE 14RF , Vibration + Noise sensors , Sound and Vibration Monitoring ABC System , Lattice Boom Crawler Crane – 50 ton capacity , 50-ton Crawler Crane , IHI – CCH800-2 Crawler Crane , Movax , Side Grip Sheet Pile Driver , Excavator Mounted Pile Driver , Movax Sonic Side-Grip Vibratory Pile Drivers , Modular Side-Grip Pile Drivers , Bray Harbour , DART Bridge, Bray , Bridge piers , Bridge buttresses